KUCHING: Some 99.7% of the bridges built in Sarawak were undertaken by Titanium Project Management Sdn Bhd, a company owned by Sarawak Chief Minister Taib Mahmud’s son Mahmud Abu Bekir.

The bridges which were designed and built by Titanium were collectively worth RM1.395 billion and funded by the state government, according to Sarawak DAP. Titanium is owned by Abu Bekir who holds 51% of the shares.

The other shareholders are Chung Soon Nam (41%) and Michael Ting Kuok Ngie (8%). Pointing this out, Sarawak DAP secretary Chong Chieng Jen said that for the past five years from 2007 to 2011, the state government had only awarded three contracts for bridges.

The design and construction of bridges and culverts to replace temporary and semi-permanent council and PWD structures worth RM1,178,410,000.00 was awarded to Titanium with no open tender.

The other two contracts which were awarded to Woodville were the construction of Sungai Sarawak Bridge at Isthmus Kuching worth RM213 million and the construction of Sungai Miri Bridge and associated works at Piasau worth RM4.5 million.

Chong, who is the Kota Sentosa assemblyman and Bandar Kuching MP, said the contract awarded to Titanium ought to have been broken down by individual bridges and shared with other contractors. “If you look at the value of the contracts given out in the five years, 99.7% goes to Titanium.

“It benefits the chief minister’s son only. The three contracts alone were worth RM1.395 billion

“The construction of Sungai Sarawak Bridge linking the Isthmus with Kuching also indirectly benefits the chief minister’s family as the whole of Isthmus of 275 acres is owned by CMS, which is owned by his family,” Chong said.

 

TITANIUM PROJECT MANAGEMENT SDN. BHD

A. Maklumat Syarikat: :
Company Name : TITANIUM PROJECT MANAGEMENT SDN. BHD.
Address : LEVEL 9, TITANIUM TOWER
  LOT 1, BRIGHTON SQUARE
  JALAN SONG
Postcode 93350
Town : KUCHING
State: SARAWAK
Telephone: 082-285 999
Fax : 082-285 888
Email : ti@titanium.com.my
B. Maklumat Pendaftaran :
CIDB :
i) No Pendafataran : 0120090616-SR124134
ii) Bumiputra : Tiada Maklumat
iii) Tarikh Luput Pendaftaran : 15-06-2013
iv) Gred : G7
v) Pengkhususan :
B04 KERJA AM BANGUNAN
CE21 KERJA-KERJA AM KEJURUTERAAN AWAM


PKK :
i) No Pendafataran :
ii) Kelas :
Nombor Pendaftaran Perniagaan/Syarikat/Lain-Lain:
ROB :
ROC : 485503
No Pendaftaran Lain:
No Lesen Berniaga Sabah:
Trading License: 431277
Status*: Aktif
C.Rekod Log Pendaftaran :
Bil Mula Tamat Catatan
1. 15-04-2010 15-06-2013 R4
2. 08-06-2009 15-06-2010 R1
D. Maklumat Ahli Lembaga Pengarah:
Bil Nama Warganegara Jawatan
1. CHUNG SOON NAM MALAYSIA PENGARAH URUSAN
2. MICHAEL TING KUOK NGIE @TING KOK KGIE MALAYSIA PENGARAH
E.Maklumat Pemegang Saham:
Bil Nama Warganegara Syer / Ekuiti
F. Taraf Bumiputera:
G.Modal Berbayar / Modal Terkumpul :
  a.Modal Dibenarkan (RM):
b.Modal Berbayar / Modal Terkumpul (RM): 9,000,000.00
H.Maklumat Projek:
Bil Tajuk Tarikh Anugerah Nilai (RM) Kilen
1. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridge And Some JKR Bridges 30-05-2012 RM 3,018,659.67 JABATAN KERJA RAYA SARAWAK
2. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.11BKH.CB.62 (TPMSB Ref: 04B/14/PMC) 04-05-2011 RM 8,770,780.88 JABATAN KERJA RAYA SARAWAK
3. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges. Package Ref. PWD/HO/B039/2008.05BSM.CB61. (TPMSB Ref:01B/09/SMJDC) 23-03-2011 RM 1,843,175.33 JABATAN KERJA RAYA SARAWAK
4. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref. PWD/HO/B039/2008.04BSM. CB60. (TPMSb Ref:02B/04/ASJDC) 18-01-2011 RM 2,585,232.94 JABATAN KERJA RAYA SARAWAK
5. The Design, C & C of Bridges & Culverts to replace Temp.& Semi-Permanent Council Bridges & Some JKR Bridges In Swk. Package Ref. PWD/HO/B039/2008.06SK.CB66. (TPMSB Ref: 03/03/MJDC) Sg. Sebatu 1& Sg. Sebatu 2;Sg. Lemayong, Sg. Strass in Meradong/Julau Dist., Sarikei Division 18-01-2011 RM 10,572,830.67 JABATAN KERJA RAYA SARAWAK
6. The Design, C & C of Bridges and Culvets to replace Temp. and Sem-Permenant Council Bridges & Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.04SK.CB64, (TPMSB Ref: -01/03/MJDC) Bridge over Sg. Uu Mador, Sg Mador & Sg Mador Melayu; in Meradong/Julau Dist. Sarikei Division 18-01-2011 RM 7,248,000.08 JABATAN KERJA RAYA SARAWAK
7. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temp. & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.13KH.CB96. (TPMSB Ref:03/04/LDC) Jambatan Belian No. 1/Kpg. Keranji, Sematan 18-01-2011 RM 1,582,103.77 JKR SARAWAK
8. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temp. & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.05BMK.CB56. (TPMSB Ref:02B/05/DLDC) Sg Pangin At Jalan Kpg. Baru Cina, Dalat 18-01-2011 RM 2,384,527.53 JKR SARAWAK
9. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.18KH.CB87 18-01-2011 RM 4,731,409.61 JABATAN KERJA RAYA SARAWAK
10. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges and Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.05SK.CB65 18-01-2011 RM 6,775,056.24 JABATAN KERJA RAYA SARAWAK
11. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.21KH.CB89 18-01-2011 RM 6,335,353.44 JABATAN KERJA RAYA SARAWAK
12. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.24KH.CB92 18-01-2011 RM 2,317,096.86 JABATAN KERJA RAYA SARAWAK
13. Package Ref.PWD/HO/B039/2008.11SM.CB98 – (TPMSB Ref:06/10/SDC) “The Design, Construction & Completion Of Bridges & Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak.” 18-01-2011 RM 1,843,175.33 JABATAN KERJA RAYA SARAWAK
14. Package Ref.PWD/HO/B039/2008.12SM.CB74. – (TPMSB Ref: 07/10/SDC) – “The Design, Construction & Completion Of Bridges & Culverts To Replace Temporary And Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak. 18-01-2011 RM 4,419,136.11 JABATAN KERJA RAYA SARAWAK
15. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.05BET.CB81. a) Bridge Over Sg. Malupa Along Jln. SRK Ng. Assam/Ng. Malupa b) Bridge Over Sg. Kara Along Jln. SRK Ng. Assam/Ng. Malupa 18-01-2011 RM 7,022,487.62 JABATAN KERJA RAYA SARAWAK
16. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.03BMK.CB55. a) Bridge Over Sg. Ud Muara Along Jalan Kpg. Hilir/Kpg. Tengah Dalat In Dalat District, Mukah Division 18-01-2011 RM 9,198,741.83 JABATAN KERJA RAYA SARAWAK
17. The Design, Construction & Completion Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008. 04BET. CB80 (TPMSB Ref:03/03/BETDC) : Sg. Geraji & Sg. Bran, Jalan Berbangai In Betong District, Betong Division 18-01-2011 RM 4,400,781.00 JABATAN KERJA RAYA SARAWAK
18. The Design, Construction & Completion Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.14SB.CB72 (TPMSB Ref:12/14/SRDC) : Sg. Latap, Sg. Naman 1 & Sg. Naman 2 In Sibu Division 18-01-2011 RM 5,765,997.94 JKR SARAWAK
19. The Design, Construction & Completion Of Bridges And Culverts To Replace Temporary & Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008. 03BET. CB79 (TPMSB Ref:02/03 BETDC) : Sg Pasa In Betong Division 18-01-2011 RM 1,843,175.33 JABATAN KERJA RAYA SARAWAK
20. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. 18-01-2011 RM 4,515,137.77 JKR SARAWAK
21. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.01SA.CB99 18-01-2011 RM 23,563,600.93 JABATAN KERJA RAYA SARAWAK
22. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.06BET.CB.82 (TPMSB Ref: 03/03/SRTDC) Sarawak. 18-01-2011 RM 4,223,568.96 JABATAN KERJA RAYA SARAWAK
23. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.22KH.CB.90.(TPMSB Ref: 11/14/PMC). (TPMSB Ref: 04B/14/PMC) Sarawak 18-01-2011 RM 12,047,642.15 JABATAN KERJA RAYA SARAWAK
24. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.18SM.CB78 a) Bridge At Jalan Sekedu Along Jln. Sekedu b) Bridge At Kpg. Sg. Lingkau No. 1 Along Jln. Kpg. Sg. Lingkau c) Bridge At Kpg. Sg. Lingkau No. 2 Along Jln. Kpg. Sg. Lingkau 18-01-2011 RM 10,939,696.45 JABATAN KERJA RAYA SARAWAK
25. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.20KH.CB88 (TPMSB Ref:09/14/PMC) (a) Bridge over Sg. Tengah 1 along Jln. Taman Maliha/Kpg. Kolong 1 (b) Bridge over Sg. Tengah 2 along Jln. Taman Maliha/Kpg. Kolong 1 18-01-2011 RM 6,506,794.02 JABATAN KERJA RAYA SARAWAK
26. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.12BKH.CB63 (TPMSB Ref: 05B/14/PMC) (a) Bridge over Sg. Abang along Jalan Benguh/Danu (b) Jamabatan Kpg. Stabut along Jalan Kpg. Stabut 18-01-2011 RM 9,489,074.60 JABATAN KERJA RAYA SARAWAK
27. The Design & Completion of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges in Sarawak. Package Ref.PWD/HO/B039/2008. 16KH. CB86 (Jamb. Kpg Begu No. 1 & Kpg Begu No.2) Padawan, Kuching Division 18-01-2011 RM 4,072,848.86 JABATAN KERJA RAYA SARAWAK
28. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.28KH.CB94 (a) Bridge over Sg. Stenggang 2 along Jln. Kpg. Stenggang (b) Jambatan at Sibulung along Jln. Kpg. Sibulung 18-01-2011 RM 3,412,474.68 JABATAN KERJA RAYA SARAWAK
29. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.16SM.CB77 (a) Bridge at Kpg. Moyan Laut No. 2 along Jalan Kpg. Moyan Laut 18-01-2011 RM 2,214,204.14 JABATAN KERJA RAYA SARAWAK
30. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.04MR.CB67 (a) Bridge Over Sg. Tapan Kecil along Access Road to Tapan (b) Bridge Over Sg. Sebato along Access to SRK Sebato (c) Bridge Over Sg. Satap 1 along Access to Rh. Muking 18-01-2011 RM 6,748,296.26 JABATAN KERJA RAYA SARAWAK
31. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.23KH.CB91 18-01-2011 RM 1,506,002.58 JABATAN KERJA RAYA SARAWAK
32. Contract No: PWD/HO/B039/2008 02MR.CB30 The Design, Construction And Completion Of Bridges And Culvert To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridge In Sarawak – Padang Kerbau Bridge No.2 Along Jln Kampung Padang Kerbau 28-10-2010 RM 1,731,593.89 JABATAN KERJA RAYA SARAWAK
33. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.08SM.CB37 01-10-2009 RM 4,515,137.77 JABATAN KERJA RAYA SARAWAK
34. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Coucil Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.02BET.CB47 01-10-2009 RM 3,164,207.54 JABATAN KERJA RAYA SARAWAK
35. The Design ,Construction And Completion Of Bridges And Culvert To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges in Sarawak -Package Ref.PWD/HQ/B039/2008.05LG.CB26 (TPSMB Ref: 03/04/LGDC) 01-10-2009 RM 2,701,156.92 JABATAN KERJA RAYA SARAWAK
36. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.10KH.CB42 01-10-2009 RM 7,563,537.78 JABATAN KERJA RAYA SARAWAK
37. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.05SM.CB45 TPMSB Ref: 01/09/SMJDC 01-10-2009 RM 4,832,441.58 JABATAN KERJA RAYA SARAWAK
38. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref. PWD/HO/B039/2008. 03BSM. CB43. (TPMSB Ref:01B/04/ASJDC) 01-10-2009 RM 1,582,103.77 JABATAN KERJA RAYA SARAWAK
39. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.04MK.CB27 a) Jambatan Sg. Lintang Along Jalan Kpg. Lintang, Balingan 01-10-2009 RM 2,784,097.01 JABATAN KERJA RAYA SARAWAK
40. The Design, Const.& Comp. Of Bridges And Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges in Sarawak. Package Ref.PWD/HO/039/2008.05MK.CB.28 (TPMSB Ref:02/05/DLDC) Jln.Kpg.Baru Cina, Dalat 01-10-2009 RM 10,105,240.99 JABATAN KERJA RAYA SARAWAK
41. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref. PWD/HO/B039/2008.12KH.CB53 (TPMSB Ref:05/14/PMC) 01-10-2009 RM 1,755,752.00 JABATAN KERJA RAYA SARAWAK
42. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.11KH.CB52 01-10-2009 RM 6,870,600.61 JABATAN KERJA RAYA SARAWAK
43. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.04SM.CB44 01-10-2009 RM 4,057,379.47 JABATAN KERJA RAYA SARAWAK
44. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.07SM.CB36 TPMSB Ref: 02/02/SMDC 01-10-2009 RM 1,843,175.33 JABATAN KERJA RAYA SARAWAK
45. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.02BT.CB24 01-10-2009 RM 3,646,802.02 JABATAN KERJA RAYA SARAWAK
46. The Design, Construction And Completion Of Bridges And Culvert To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak – PWD/HO/B039/2008.04LG.CB25 01-10-2009 RM 5,929,095.48 JABATAN KERJA RAYA SARAWAK
47. The Design Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.03MR.CB33 28-09-2009 RM 4,093,285.49 JABATAN KERJA RAYA SARAWAK
48. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges in Swk-PWD/HQ/B039/2008.08KH.CB40 14-05-2009 RM 1,506,002.58 JABATAN KERJA RAYA SARAWAK
49. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temp. & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.02SB.CB31 (TPMSB Ref:01/14/SRDC) Sg. Rongan & Sg. Naman at Sg.Assan Road, Durin 14-05-2009 RM 8,324,597.02 JKR SARAWAK
50. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.07SB.CB48 14-05-2009 RM 7,839,479.50 JABATAN KERJA RAYA SARAWAK
51. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.09SB.CB50 14-05-2009 RM 7,205,139.96 JABATAN KERJA RAYA SARAWAK
52. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.08SB.CB49 14-05-2009 RM 8,080,587.53 JABATAN KERJA RAYA SARAWAK
53. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.11SB.CB23 14-05-2009 RM 14,301,347.66 JABATAN KERJA RAYA SARAWAK
54. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.10SB.CB51 14-05-2009 RM 8,849,531.27 JABATAN KERJA RAYA SARAWAK
55. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.06SB.CB35 14-05-2009 RM 6,738,361.78 JABATAN KERJA RAYA SARAWAK
56. The Design, Const. And Comp. Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges in Swk- PWD/HQ/B039/2008.09KH.CB41 14-05-2009 RM 1,506,002.58 JABATAN KERJA RAYA SARAWAK
57. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.03SB.CB22 07-05-2009 RM 4,489,769.09 JABATAN KERJA RAYA SARAWAK
58. Pakage Ref.PWD/HO/B039/2008.01LG.CB14 (TPMSB Ref: 01/04/LGDC) Comfirmation Of Pakage Contract Price The Design Construction And Completion Of Bridges And Culvert To Replace Temporary and Semi-Permanent Council Bridges and Some JKR Bridges In Sarawak 23-12-2008 RM 14,208,548.28 JABATAN KERJA RAYA SARAWAK
59. The Design, Const. & Comp. Of Bridges & Culvets To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.03LG.CB18 (TPMSB Ref: 02/04LGDC) 20-11-2008 RM 5,269,660.16 JABATAN KERJA RAYA SARAWAK
60. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-PermanentCouncil Bridges And Some JKR Bridges In Sarawak (Pakage Ref. PWD/HO/B039/2008.01MR.CB09) 20-11-2008 RM 6,739,780.99 JABATAN KERJA RAYA SARAWAK
61. The Design,Construction & Completion Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Briges & Some JKR Bridges In Sarawak-Package Ref. PWD/HQ/B039/2008.01 BET.CB20 20-11-2008 RM 4,045,410.80 JABATAN KERJA RAYA SARAWAK
62. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.01SK.CB02 20-11-2008 RM 13,755,420.00 JABATAN KERJA RAYA SARAWAK
63. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.01BT.CB08 20-11-2008 RM 12,852,292.98 JABATAN KERJA RAYA SARAWAK
64. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.03MK.CB21 (TPMSB Ref: 01B/05/DLDC) 20-11-2008 RM 1,703,804.06 JABATAN KERJA RAYA SARAWAK
65. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.01SB.CB05 20-11-2008 RM 19,871,501.85 JABATAN KERJA RAYA SARAWAK
66. The Design, Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref.PWD/HO/B039/2008.03KH.CB07 20-11-2008 RM 6,502,583.69 JABATAN KERJA RAYA SARAWAK
67. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.02MK.CB16 20-11-2008 RM 14,794,718.41 JABATAN KERJA RAYA SARAWAK
68. The Design, Const. & Comp. Of Bridges & Culvets To Replace Temporary & Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HO/B039/2008.02KH.CB06 (TPMSB Ref: 01/04/LDC) 20-11-2008 RM 4,938,235.81 JKR SARAWAK
69. The Design,Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Sarawak. Package Ref. PWD/HQ/B039/2008.02SM.CB19 20-11-2008 RM 5,724,367.78 JABATAN KERJA RAYA SARAWAK
70. The Design,Construction And Completion Of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges In Swk. Package Ref. PWD/HQ/B039/2008.01SM.CB10 20-11-2008 RM 5,087,930.94 JABATAN KERJA RAYA SARAWAK
71. The Design, Const. & Comp. Of Bridges & Culvets To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039.2008.02SK.CBB03 & Package Sarawak. Ref.PWD/HO/B039/2008.03SK.CBB04, Sarawak. 20-11-2008 RM 31,454,526.19 TITANIUM MANAGEMENT SENDIRIAN BERHAD
72. The Design, Construction And Completion of Bridges And Culverts To Replace Temporary And Semi-Permanent Council Bridges And Some JKR Bridges in Swk- Package Ref. PWD/HO/B039/2008.01KH.CB01 20-11-2008 RM 17,396,486.95 KTA (SARAWAK) SDN BHD
73. The Design, Const. & Comp. Of Bridges & Culverts To Replace Temporary & Semi-Permanent Council Bridges & Some JKR Bridges In Sarawak Package Ref.PWD/HO/B039/2008.01MK.CB15 20-11-2008 RM 9,415,568.01 JABATAN KERJA RAYA SARAWAK

Opposition riles Taib with questions on contracts

KUCHING: Sarawak’s Chief Minister Taib Mahmud lost his cool in the State Legislative Assembly yesterday when an opposition assemblyman sought clarification over contracts awarded to his son Abu Bekir Mahmud’s company Titanium Management Project Sdn Bhd.

Kota Sentosa assemblyman Chong Chieng Jen hit a raw nerve in Taib when he stood up to raise a point of order, interjecting Taib’s winding-up speech during the final day sitting of the state assembly.Chong wanted to know from Taib himself the number of contracts given to Abu Bekir’s company.A visibly angry Taib challenged Chong to repeat the allegation outside the house. Chong, who has been exposing irregularities in the awarding of contracts by the state government, accepted the challenge.At a press conference later, Chong repeated what he said in the state assembly. He said Titanium Project Management had been awarded construction of a few hundred bridges worth RM1,178,410,000 without open tender.

The five-year contract for the bridges was awarded in 2008. In 2001, the government awarded the construction of 384 bridges to Titanium Management Sdn Bhd for RM500 million.

The company managed to complete 332 bridges or 80 percent of the job, but over the years the cost had spiralled. According to Chong, the government now has to pay the company RM948 million.

He reiterated that Titanium Management belonged to Abu Bekir. Chong had submitted questions on the awarding of the government contracts to Titanium Project Management, but Speaker Awang Asfia Nassar had rejected them.

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: